All changes to tower
Date | Change | Source |
---|---|---|
22 Jul 2012 | No longer GF: ringing gallery installed | Andrew Giles via e-mail |
31 Jul 2018 | PN info added | Izabelle Bimson(info: Mary Pool, Tower Corresp) via e-mail |
24 Sep 2022 | PN deleted; Fr1A, Fr1B added; 1-6: turning, frame number added | Rob Palmer, acting steeple keeper |
29 Dec 2022 | Convert 1A and 1B to 1 and 1.1 as, whilst independent frames, they are the same collection and logically connected | |
8 May 2023 | URL and PN added. As the PN is occasional, please check first | Rob Palmer (acting steeple keeper), on behalf of Twr.Capt. Richard Garner #005001 |
27 Jun 2023 | Fr1: resultant layout amended (Fr1 Overall Layout is Layout 8.1 minus Pits A and F) | Information (pictures) provided by Rob Palmer, acting steeple keeper |