St Tudy, Cornwall, S Tudy
Place | St Tudy S Tudy |
Unitary authority | Cornwall |
Lieutenancy area | Cornwall |
Country | England |
Historic county | Cornwall |
Dove tower ID | 12468 |
Rings | 6 (full-circle ring), tenor 12–0–14 in F♯See below |
Frames | 2See below |
Grid reference | SX066763 |
Latitude & longitude | 50.55440, -4.73148View on Google Map or OpenStreetMapList nearest towers |
Satnav lat & long | A suggested satnav destination for this tower is at 50.55467, -4.73087 View on Google MapEdit details |
Postcode | PL30 3NW |
Diocese | Truro |
Church | Church of England |
Listed grade | I by Historic England |
Church heritage record | 13734 |
Affiliation | Truro Diocesan Guild |
Performances | Search for performances on BellBoard |
Ring of 6, tenor 12–0–14 in F♯
Bells | 6 (full-circle ring)Edit details |
Tenor | 12–0–14 (1358 lb or 616 kg) in F♯ (732.5 Hz) |
Overhauled | 2020 by John Taylor & Co 3 h/s: new gudgeons & bearings; general restoration |
Peals | View 5 peals in the Felstead Database |
Also | Ground floor ringing chamber |
Bell | Weight | Nominal | Note | Diameter | Dated | Founder | Canons | Turning | Hanging | ||
---|---|---|---|---|---|---|---|---|---|---|---|
1 | 4–3–19 | 1220.0 | D♯ | 28.50″ | 1923 | Gillett & Johnston | F | FC | |||
2 | 5–3–11 | 1098.0 | C♯ | 30.63″ | 1974 | John Taylor & Co | F | FC | |||
3 | 6–2–13 | 976.0 | B | 33.00″ | 1751 | Abel Rudhall | R | FC | |||
4 | 7–0–19 | 915.0 | A♯ | 34.50″ | 1751 | Abel Rudhall | R | FC | |||
5 | 8–0–26 | 823.0 | G♯ | 37.00″ | 1888 | Gillett & Co | R | FC | |||
6 | 12–0–14 | 732.5 | F♯ | 41.13″ | 1974 | John Taylor & Co | F | FC |
Details of frames
Frame | Bells | Year | Material | Maker | Truss | Layout | ||
---|---|---|---|---|---|---|---|---|
2 | 4,5 | 1974 | Steel | Arthur Fidler | 8.1.H.b | 2.X1 | ||
1 | 1,2,3,6 | 1974 | Steel | Arthur Fidler | 8.1.H.b | 4.3 |
Update log
17/12/2023 | Fr1,Fr2: year, material, maker, truss, layout added [Owen Borlase via Frame Backlog] |
23/05/2021 | Frame numbers added [Owen Borlase] |
14/07/2020 | Restoration work complete [TimJ(#288) via e-mail] |
14/07/2020 | Restoration work under way [TimJ(#285) via e-mail] |
17/03/2019 | SatNav destination added [Paul Tucker, Tower Captain via SatNav] |