Darling Point, New South Wales, Australia, S Mark
Place | Darling Point S Mark or Sydney |
State | New South Wales |
Country | Australia |
Dove tower ID | 11755 |
Rings | 8 (full-circle ring), tenor 8–1–26 in ASee below |
Frames | 2See below |
Latitude & longitude | -33.87476, 151.23633View on Google Map or OpenStreetMapList nearest towers |
Satnav lat & long | No optimised destination for satellite navigation has been submittedAdd details |
Diocese | Sydney |
Church | Anglican Church of Australia |
URL | http://www.anzab.org.au/towers.php?tower=DAR |
Affiliation | Australian and New Zealand Association |
Performances | Search for performances on BellBoard |
Ring of 8, tenor 8–1–26 in A
Bells | 8 (full-circle ring)Edit details |
Tenor | 8–1–26 (950 lb or 431 kg) in A (882.5 Hz) |
Practices | Wed (check with contact) 17:00 |
Overhauled | 1988 |
Peals | View 39 peals in the Felstead Database |
Bell | Weight | Nominal | Note | Diameter | Dated | Founder | Canons | Turning | Hanging | ||
---|---|---|---|---|---|---|---|---|---|---|---|
1 | 3–0–7 | 1763.5 | A | 22.75″ | 1923 | Mears & Stainbank | R | 4 | FC | ||
2 | 3–1–12 | 1666.5 | G♯ | 24.25″ | 1923 | Mears & Stainbank | R | 4 | FC | ||
3 | 3–2–23 | 1482.5 | F♯ | 25.75″ | 1861 | George Mears | R | 4 | FC | ||
4 | 4–1–14 | 1324.5 | E | 27.75″ | 1861 | George Mears | R | 4 | FC | ||
5 | 4–3–24 | 1181.0 | D | 29.75″ | 1861 | George Mears | R | 4 | FC | ||
6 | 6–0–9 | 1113.0 | C♯ | 31.50″ | 1861 | George Mears | R | 4 | FC | ||
7 | 6–1–16 | 992.0 | B | 33.25″ | 1861 | George Mears | R | 4 | FC | ||
8 | 8–1–26 | 882.5 | A | 36.50″ | 1861 | George Mears | R | 4 | FC |
Details of frames
Frame | Bells | Year | Material | Maker | Truss | Layout | ||
---|---|---|---|---|---|---|---|---|
2 | 2,5,7 | 1988 | Steel | Locally manufactured | ||||
1 [1] | 1,3,4,6,8 | 1988 | Steel | Locally manufactured |
Notes
[1]Frame maker
The frame was made to Whitechapel Foundry drawings and was made by Tyree Industries. It was installed by a Sydney builder that worked for Sir William Tyree. I had the responsibilities to supervise the installation. [L Rusty Bullivant-Walters]
Published: 09/04/2022
Update log
25/03/2022 | Overhaul date amended; Fr2 date amended; 1-8: turning added [Rusty Bullivant-Walters] |