✖
  • Home
  • About Dove
  • Towers
  • Frames
  • Bells
  • Founders
  • Projects
  • Site Map
  • Help
≡ Dove’s Guide for Church Bell Ringers
⚲
✖
Chicago, Illinois, United States of America, Mitchell Tower, University of Chicago
Place Chicago, University of Chicago
Mitchell Tower
Shown in county lists as Chicago, Mitchell Tower
State Illinois
Country United States of America
Dove tower ID 11762
Rings 10 (full-circle ring), tenor 21–3–7 in E♭See below
Frames 1See below
Latitude & longitude 41.79125, -87.59828View on Google Map or OpenStreetMapList nearest towers
Satnav lat & long No optimised destination for satellite navigation has been submittedAdd details
Postcode 60637
Ownership Local Authority (Secular)
Also Toilet
URL http://changeringers.uchicago.edu
Affiliation North American Guild
Performances Search for performances on BellBoard
Ring of 10, tenor 21–3–7 in E♭
Bells 10 (full-circle ring)Edit details
Tenor 21–3–7 (2443 lb or 1108 kg) in E♭
All rings
10, 21–3–7 in E♭
6, 8–3–10 in B♭
Practice Sat (check with contact before all practices) 11:00
Peals View 19 peals in the Felstead Database
Also Simulator
Bell Weight Nominal Note Diameter Dated Founder Canons Turning
1 5–0–4 G 27.25" 1908 Mears & Stainbank D N
2 5–2–13 F 28.75" 1908 Mears & Stainbank D N
3 6–1–12 E♭ 30.75" 1908 Mears & Stainbank D N
4 6–1–27 D 31.88" 1908 Mears & Stainbank D N
5 7–1–0 C 34.00" 1908 Mears & Stainbank D N
6 8–3–10 B♭ 36.63" 1908 Mears & Stainbank D N
7 10–2–17 A♭ 39.38" 1908 Mears & Stainbank D N
8 11–3–24 G 41.50" 1908 Mears & Stainbank D N
9 16–1–0 F 45.75" 1908 Mears & Stainbank D N
10 21–3–7 E♭ 51.00" 1908 Mears & Stainbank D N
Source: J Hedgcock(twr notice); TimJ(REMRKS273)
Contributed by: [James Hedgcock]
Details of frame
Frame Bells Year Material Maker Truss Layout
1 1,2,3,4,5,6,7,8,9,10 1908 Steel Mears & Stainbank 8.1.B.a 10
Contributed by: Tim Jackson
Update log
25/03/2022 PN amended [Tom Farthing, local contact.]
09/04/2020 Presence of simulator added; URL added [TimJ(#273) via e-mail]
09/04/2020 Practice info amended: also Sat 11:00; check invariably [TimJ(#273 per T Farthing) via e-mail]
09/04/2020 fr1: date,maker confirmed [Tim Jackson via e-mail]
15/10/2019 Indication of available toilet facility added [TimJ (REMRKS247; info L Lazzerini) via e-mail]
25/08/2019 1-10: turning added; frame: date,maker added [Tim Jackson via 00013601]
19/08/2019 frame: material amended,truss,layout added [Tim Jackson via e-mail]
See full public log
Copyright © 2003–2022 Central Council of Church Bell Ringers
Content: Dove Team — Programming: Sid Baldwin & Richard Smith.
Download data
Admin Login   Acknowledgements