Aldingbourne, West Sussex, S Mary V
Place | Aldingbourne S Mary V |
Lieutenancy area | West Sussex |
Country | England |
Historic county | Sussex |
Dove tower ID | 12391 |
Rings | 5 (full-circle ring), tenor 6–1–14 in BSee below |
Frames | 2See below |
Grid reference | SU923054 |
Latitude & longitude | 50.84154, -0.68985View on Google Map or OpenStreetMapList nearest towers |
Satnav lat & long | No optimised destination for satellite navigation has been submittedAdd details |
Postcode | PO20 3TT |
Diocese | Chichester |
Church | Church of England |
Listed grade | I by Historic England |
Church heritage record | 3159 |
Also | Toilet |
Affiliation | Sussex County Association |
Performances | Search for performances on BellBoard As of last night, BellBoard listed 9 performances here, of which 2 were peals and none were in the last two years |
Ring of 5, tenor 6–1–14 in B
Bells | 5 (full-circle ring)Edit details |
Tenor | 6–1–14 (714 lb or 324 kg) in B (960.0 Hz) |
Practices | Mon (exc Bank Hols) |
Overhauled | 1996 by Eayre & Smith Treble of former 3 recast and 2 new trebles added to augment to 5. All bells rehung on new fittings, in a new steel frame lower in the tower, preserving the old frame.
Tenor retuned |
Peals | View 4 peals in the Felstead Database |
Also | Ground floor ringing chamber |
Bell | Weight | Nominal | Note | Diameter | Dated | Founder | Canons | Turning | Hanging | ||
---|---|---|---|---|---|---|---|---|---|---|---|
1 | 3–1–26 | 1443.0 | F♯ | 25.13″ | 1996 | Eijsbouts | F | N | FC | ||
2 | 3–3–16 | 1283.0 | E | 26.50″ | 1996 | Eijsbouts | F | N | FC | ||
3 | 4–2–9 | 1212.0 | D♯ | 28.00″ | 1996 | Eijsbouts | F | N | FC | ||
4 | 5–3–3 | 1085.0 | C♯ | 30.25″ | 1615† | Thomas Wakefield | R | Y | FC | ||
5 | 6–1–14 | 960.0 | B | 33.13″ | 1615† | Thomas Wakefield | R | U | FC |
Details of frames
Frame | Bells | Year | Material | Maker | Truss | Layout | ||
---|---|---|---|---|---|---|---|---|
2 | 1889 | Timber | John Warner & Sons | 6.A | 4.3 | |||
1 | 1,2,3,4,5 | 1996 | Steel | Eayre & Smith | 8.1.F.e | 5.12 R |
Update log
01/07/2024 | 1-5: turning added; frames added; overhaul added [Kye L Leaver, personal visit (01/07/2024)] |