Longbridge Deverill, Wiltshire, S Peter & S Paul
Place | Longbridge Deverill S Peter & S Paul |
Unitary authority | Wiltshire |
Lieutenancy area | Wiltshire |
Country | England |
Historic county | Wiltshire |
Dove tower ID | 17006 |
Rings | 8 (full-circle ring), tenor 12–3–0 in F♯See below |
Frames | 2See below |
Grid reference | ST866413 |
Latitude & longitude | 51.17138, -2.19263View on Google Map or OpenStreetMapList nearest towers |
Satnav lat & long | No optimised destination for satellite navigation has been submittedAdd details |
Postcode | BA12 7DL |
Diocese | Salisbury |
Church | Church of England |
Listed grade | II* by Historic England |
Church heritage record | 12415 |
URL | http://www.sdgr.org.uk/branches/devizes/tower-134 |
Affiliation | Salisbury Diocesan Guild |
Performances | Search for performances on BellBoard |
Ring of 8, tenor 12–3–0 in F♯
Bells | 8 (full-circle ring)Edit details |
Tenor | 12–3–0 (1428 lb or 648 kg) in F♯ (724.0 Hz) |
Peals | View 15 peals in the Felstead Database |
Bell | Weight | Nominal | Note | Diameter | Dated | Founder | Canons | Turning | Hanging | ||
---|---|---|---|---|---|---|---|---|---|---|---|
1 | 4–1–5 | 1451.5 | F♯ | 26.00″ | 1949 | Mears & Stainbank | F | N | FC | ||
2 | 4–1–22 | 1372.5 | E♯ | 27.00″ | 1949 | Mears & Stainbank | F | N | FC | ||
3 | 4–2–3 | 1216.5 | D♯ | 28.75″ | 1882 | John Warner & Sons | D | N | FC | ||
4 | 4–3–3 | 1086.5 | C♯ | 29.00″ | 1814 | James Wells | Y | 4 | FC | ||
5 | 5–0–17 | 966.5 | B | 31.00″ | 1614 | Richard I Purdue | R | 4 | FC | ||
6 | 7–1–19 | 910.5 | A♯ | 34.63″ | 1763 | Thomas Rudhall | Y | 4 | FC | ||
7 | 8–3–21 | 818.0 | G♯ | 38.13″ | 1908 | Llewellins & James | F | N | FC | ||
8 | 12–3–0 | 724.0 | F♯ | 42.63″ | 1739 | William Cockey | R | 4 | FC |
Details of frames
Frame | Bells | Year | Material | Maker | Truss | Layout | ||
---|---|---|---|---|---|---|---|---|
1 [1] | 3,4,5,6,7,8 | 1902 | Cast iron | Thomas Blackbourn | 8.3.A.c & 8.3.A.g | 6.1 ➔ ~ 8.3 | ||
– 1.1 [2] | 1,2 | 1949 | Cast iron | Mears & Stainbank | 8.3.A.h | ~ 2.X2 |
Notes
[1]Resultant frame layout
Fr1 Resultant Layout is 8.3 except there is a gap of about two feet between the two end-to-end pits holding the trebles.
Published: 03/08/2024
[2]Frame layout
The extension forms 2 end to end pits which are about 2 feet apart (so arguably forming 2 extensions).
Published: 03/08/2024
Update log
12/09/2024 | 3: canons amended [Jack Pease; re-evaluation of previously submitted material] |
04/09/2024 | 1-8: nominal, turning added [Jack Pease, from personal visit. Recorded and analysed by Jack Pease] |
14/08/2024 | 1-8: canons added [Jack Pease, from personal visit. Additional information taken from the Christopher Dalton papers] |
03/08/2024 | Fr 1 added. [Jack Pease visit, Christopher Dalton papers.] |